Tag: Boeing 737 Max product design challenges

Two Added and Explosive Revelations Involving the Boeing 737 MAX

The Supply Chain Matters blog calls reader attention to two new revelations concerning the ongoing Boeing 737 MAX aircraft grounding crisis, scheduled to be shared today before a U.S. Congressional Review committee. From our Supply Chain Matters lens, such revelations likely have major implications for Boeing and the manufacturer’s associated supply network partners moving forward.

Read More

NTSB Recommends 737 MAX Aircraft Flight Control Design Changes

Supply Chain Matters alerts readers to today’s report from the U.S. NTSB recommending that Boeing and the FAA utilized unrealistic assumptions regarding the flight control systems of the 737 MAX aircraft. Assumptions that the aircraft may return to global-wide operational service by the end of 2019 may be premature.

Read More

Breaking News- Boeing to Establish Permanent Board Level Safety Committee

The Supply Chain Matters blog highlights breaking news indicating that Boeing’s Board of Directors will establish a new Aerospace Safety Committee, to be led by a former Vice Chairman of the U.S. Joint Chiefs of Staff, in the light of the ongoing Boeing 737 MAX global groundings.

Read More
Loading

SUSTAINING SPONSORS

Kinaxis Dec_2018

September 2020
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
282930  

JOIN OUR MAILING LIST

RECEIVE POSTS VIA EMAIL

Categories

Archives